Can a Client Refuse Payment After Accepting Completed Work?

Dear Atty. Gab,

Musta Atty! I’m Maria Hizon, and I run a small interior design and renovation business here in Quezon City. I find myself in a very frustrating situation and I hope you can offer some clarity. Six months ago, I entered into a contract with a client, Mr. Andres Santiago, for a complete renovation of his condominium unit for a fixed price of P850,000.00. The contract specified a ‘lump sum’ price for the scope of work detailed in the plans.

During the project, Mr. Santiago was very hands-on. He requested a major change not included in the original plan: the construction of a custom floor-to-ceiling bookshelf with a built-in media center. We discussed this, and I sent him an email with a detailed cost breakdown of P120,000 for the additional work, which he replied to with ‘Okay, please proceed.’ Upon project completion, he did a final walkthrough and signed a ‘Project Completion and Acceptance Form,’ stating that the work was completed to his satisfaction.

The problem is, he has only paid the initial contract price and is now refusing to pay the P120,000 for the bookshelf. Furthermore, he is withholding the final 10% retention fee (P85,000), suddenly claiming that the paint job in the master bedroom, which was part of the original scope, is ‘substandard.’ I am at a loss. How can he complain about the quality now, after he formally accepted the entire project? And isn’t he obligated to pay for the additional work he approved? I feel like I’m being taken advantage of. What are my rights in this situation?

Dear Maria,

Thank you for reaching out. I understand your frustration, as your situation involves principles of fairness and contractual obligations that are fundamental in business. It is disheartening when a client disputes payment after a project has been completed and accepted.

Based on your account, the law provides you with strong grounds to pursue your claim. The two key legal principles at play here are estoppel and the rules governing additional work in lump sum contracts. In simple terms, the client’s formal act of signing the Project Completion and Acceptance Form generally prevents them, or ‘estops’ them, from later claiming the work was defective to justify non-payment. Similarly, when a client provides written authorization for additional work outside a fixed-price contract, they are typically obligated to pay the agreed-upon cost for it. Your documentation, particularly the signed acceptance form and the email exchange, will be crucial in asserting your rights.

The Power of Acceptance and Written Agreements

Your situation highlights two common but critical issues in construction and service contracts: the finality of a client’s acceptance and the enforceability of claims for additional work. Philippine law on obligations and contracts provides a clear framework for resolving these disputes, aiming to prevent one party from being unjustly enriched at the expense of another.

First, let’s address the client’s refusal to pay the retention fee due to a sudden claim of ‘substandard’ work. The legal principle of estoppel is directly applicable here. Estoppel is a rule of fairness that prevents someone from going back on their word or actions when another person has relied on them in good faith. By signing the ‘Project Completion and Acceptance Form,’ your client made a formal declaration that he found your work satisfactory. He led you to believe that the project was finished and accepted, and you acted on that belief by considering the job done. For him to now falsify that acceptance to withhold payment is generally not permitted by law.

Whenever a party has, by his own declaration, act, or omission, intentionally and deliberately led another to believe a particular thing true, and to act upon such belief, he cannot, in any litigation arising out of such declaration, act or omission, be permitted to falsify it. (Section 2 (a), Rule 131 of the Rules of Court)

This principle means the acceptance form is powerful evidence. It signifies that at the time of turnover, the client inspected the work and found no defects. Unless the defect was hidden and could not have been discovered through reasonable inspection (a latent defect), his claim now holds little weight. A paint job is an obvious feature, and any dissatisfaction should have been raised before or at the time of signing the acceptance form.

Second, regarding the P120,000 for the custom bookshelf, we must look at the nature of your ‘lump sum’ contract. Such contracts are governed by Article 1724 of the Civil Code. While a lump sum agreement fixes the price for the original scope of work, it does not prevent you from being compensated for additional work, provided certain conditions are met.

Art. 1724. The contractor who undertakes to build a structure or any other work for a stipulated price, in conformity with plans and specifications agreed upon with the landowner, can neither withdraw from the contract nor demand an increase in the price on account of the higher cost of labor or materials, save when there has been a change in the plans and specifications, provided: (1) Such change has been authorized by the proprietor in writing; and (2) The additional price to be paid to the contractor has been determined in writing by both parties.

Jurisprudence clarifies that these two requirements—written authorization and a written agreement on the price—are essential for a contractor to claim payment for additional work. The law is strict on this to avoid disputes over verbal agreements.

…compliance with these two (2) requisites is a condition precedent for recovery and hence, the absence of one or the other condition bars the claim for additional costs. Notably, neither the authority for the changes made nor the additional price to be paid therefor may be proved by any evidence other than the written authority and agreement as above-mentioned.

In your case, you have strong evidence. The client’s email reply, ‘Okay, please proceed,’ serves as the written authorization for the change. Your email detailing the P120,000 cost, combined with his affirmative reply, can be construed as the written agreement on the price. This documentation fulfills the requirements of Article 1724, obligating him to pay for the additional work. To allow him to keep the bookshelf without paying for it would result in his unjust enrichment.

Practical Advice for Your Situation

  • Organize Your Documentation: Compile a complete file containing the original contract, the signed ‘Project Completion and Acceptance Form,’ the email thread authorizing the additional work, and the email where you sent the cost breakdown for the bookshelf.
  • Draft a Formal Demand Letter: Send a formal demand letter to Mr. Santiago via registered mail with a return card. This creates a formal record of your demand. Clearly state the outstanding amounts (P85,000 retention and P120,000 for the bookshelf).
  • Cite the Acceptance Form: In your letter, specifically reference the date he signed the acceptance form and state that this act of acceptance legally prevents him (estops him) from now claiming substandard work as a reason for non-payment of the retention fee.
  • Reference the Written Approval for Additional Work: Clearly refer to his email approval as the written authorization required by law for you to claim payment for the custom bookshelf. Attach a copy of the email exchange to your demand letter.
  • Set a Deadline: Give him a reasonable deadline to settle the full amount (e.g., 10-15 days from receipt of the letter), and state that his failure to do so will compel you to pursue legal remedies to protect your interests.
  • Consult a Lawyer for the Demand Letter: While you can draft it yourself, having a lawyer write and send the demand letter often signals a higher level of seriousness and can be more effective in compelling payment.
  • Consider Small Claims Court: If the total amount owed (P205,000) is within the current threshold for Small Claims Court in your jurisdiction, this could be a faster and less expensive option for you to recover the payment without needing a lawyer to represent you in court.

Hope this helps!

Sincerely,
Atty. Gabriel Ablola

For more specific legal assistance related to your situation, please contact me through gaboogle.com or via email at connect@gaboogle.com.

Disclaimer: This correspondence is provided for informational purposes only and does not constitute legal advice. For specific legal guidance tailored to your situation, please schedule a formal consultation.

About the Author

Atty. Gabriel Ablola is a member of the Philippine Bar. Gaboogle is his personal blog where he shares legal analysis and commentary on Philippine law, covering areas such as Maritime Law, Corporate Law, Taxation Law, and Constitutional Law.